Do you want to publish a course? Click here

Time and position resolution of high granularity, high counting rate MRPC for the inner zone of the CBM-TOF wall

112   0   0.0 ( 0 )
 Added by Mariana Petris
 Publication date 2016
  fields Physics
and research's language is English




Ask ChatGPT about the research

Multi-gap RPC prototypes with readout on a multi-strip electrode were developed for the small polar angle region of the CBM-TOF subdetector, the most demanding zone in terms of granularity and counting rate. The prototypes are based on low resistivity ($sim$10$^{10}$ $Omega$cm) glass electrodes for performing in high counting rate environment. The strip width/pitch size was chosen such to fulfill the impedance matching with the front-end electronics and the granularity requirements of the innermost zone of the CBM-TOF wall. The in-beam tests using secondary particles produced in heavy ion collisions on a Pb target at SIS18 - GSI Darmstadt and SPS - CERN were focused on the performance of the prototype in conditions similar to the ones expected at SIS100/FAIR. An efficiency larger than 98% and a system time resolution in the order of 70~-~80~ps were obtained in high counting rate and high multiplicity environment.



rate research

Read More

496 - S. Yang , Y.J. Sun , C. Li 2014
In order to further enhance the particle identification capability of the Beijing Spectrometer (BESIII), it is proposed to upgrade the current end-cap time-of-flight (eTOF) detector with multi-gap resistive plate chamber (MRPC). The prototypes, together with the front end electronics (FEE) and time digitizer (TDIG) module have been tested at the E3 line of Beijing Electron Positron Collider (BEPCII) to study the difference between the single and double-end readout MRPC designs. The time resolutions (sigma) of the single-end readout MRPC are 47/53 ps obtained by 600 MeV/c proton/pion beam, while that of the double-end readout MRPC is 40 ps (proton beam). The efficiencies of three MRPC modules tested by both proton and pion beam are better than 98%. For the double-end readout MRPC, no incident position dependence is observed.
77 - S. Dong , G.M. Huang , J. Fruhauf 2020
A high-performance time-of-flight (TOF) MRPC wall is being built for the CBM experiment at FAIR for charged hadron identification. The detector control system for the TOF system will be based on EPICS. All components like power supplies for low and high voltages, power distribution boxes, gas control and front-end electronics (FEE) are controlled and monitored. In a test, called mini-CBM, all these functionalities are implemented and tested. For monitoring the detector environment and the status of the front-end electronics, a slow control application is implemented based on IPbus, which is an FPGA-based slow control bus used for the TOF data acquisition system. In addition to the functions of control and monitoring, exception handling and data archiving services are implemented as well. This system has been fully verified in beam tests in 2019 at GSI.
In order to test the performance of detector/prototype in environment of laboratory, we design and build a larger area ($90times52$ $cm^2$) test platform of cosmic ray based on well-designed Multi-gap Resistive Plate Chamber (MRPC) with an excellent time resolution and a high detection efficiency for the minimum ionizing particles (MIPs). The time resolution of the MRPC module used is tested to be ~80 ps, and the position resolution along the strip is ~5 mm, while the position resolution perpendicular to the strip is ~12.7 mm. The platform constructed by four MRPC modules can be functional for tracking the cosmic rays with a spatial resolution ~6.3 mm, and provide a reference time ~40 ps.
Multi-gap Resistive Plate Chambers (MRPCs) with multi-strip readout are considered to be the optimal detector candidate for the Time-of-Flight (ToF) wall in the Compressed Baryonic Matter (CBM) experiment. In the R&D phase MRPCs with different granularities, low-resistive materials and high voltage stack configurations were developed and tested. Here, we focus on two prototypes called HD-P2 and THU-strip, both with strips of 27 cm$^2$ length and low-resistive glass electrodes. The HD-P2 prototype has a single-stack configuration with 8 gaps while the THU-strip prototype is constructed in a double-stack configuration with 2 $times$ 4 gaps. The performance results of these counters in terms of efficiency and time resolution carried out in a test beam time with heavy-ion beam at GSI in 2014 are presented in this proceeding.
Pressurized drift-tube chambers are efficient detectors for high-precision tracking over large areas. The Monitored Drift-Tube (MDT) chambers of the muon spectrometer of the ATLAS detector at the Large Hadron Collider (LHC) reach a spatial resolution of 35 micons and almost 100% tracking efficiency with 6 layers of 30 mm diameter drift tubes operated with Ar:CO2 (93:7) gas mixture at 3 bar and a gas gain of 20000. The ATLAS MDT chambers are designed to cope with background counting rates due to neutrons and gamma-rays of up to about 300 kHz per tube which will be exceeded for LHC luminosities larger than the design value of 10-34 per square cm and second. Decreasing the drift-tube diameter to 15 mm while keeping the other parameters, including the gas gain, unchanged reduces the maximum drift time from about 700 ns to 200 ns and the drift-tube occupancy by a factor of 7. New drift-tube chambers for the endcap regions of the ATLAS muon spectrometer have been designed. A prototype chamber consisting of 12 times 8 layers of 15 mm diameter drift tubes of 1 m length has been constructed with a sense wire positioning accuracy of 20 microns. The 15 mm diameter drift-tubes have been tested with cosmic rays in the Gamma Irradiation Facility at CERN at counting rates of up to 1.85 MHz.
comments
Fetching comments Fetching comments
Sign in to be able to follow your search criteria
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا