Operational Status and Power Upgrade Prospects of the Neutrino Experimental Facility at J-PARC


Abstract in English

In order to explore CP asymmetry in the lepton sector, a power upgrade to the neutrino experimental facility at J-PARC is a key requirement for both the Tokai to Kamioka (T2K) long-baseline neutrino oscillation experiment and a future project with Hyper-Kamiokande. Based on five years of operational experience, the facility has achieved stable operation with 230 kW beam power without significant problems on the beam-line apparatus. After successful maintenance works in 2013-2014 to replace all electromagnetic horns and a production target, the facility is now ready to accomodate a 750-kW-rated beam. Also, the possibility of achieving a few to multi-MW beam operation is discussed in detail.