No Arabic abstract
The luminosity in the ZEUS detector was measured using photons from electron bremsstrahlung. In 2001 the HERA collider was upgraded for operation at higher luminosity. At the same time the luminosity-measuring system of the ZEUS experiment was modified to tackle the expected higher photon rate and synchrotron radiation. The existing lead-scintillator calorimeter was equipped with radiation hard scintillator tiles and shielded against synchrotron radiation. In addition, a magnetic spectrometer was installed to measure the luminosity independently using photons converted in the beam-pipe exit window. The redundancy provided a reliable and robust luminosity determination with a systematic uncertainty of 1.7%. The experimental setup, the techniques used for luminosity determination and the estimate of the systematic uncertainty are reported.
The HERA luminosity upgrade is expected to generate two major problems in the current method of luminosity determination which is based on counting brehmsstrahlung photons: damage of the calorimeter monitor due to high primary synchrotron radiation and large multiple event (pile-up) corrections. The luminosity spectrometer presented in this talk, is a novel method that reduces the impact of these problems in the luminosity measurement and is expected to yield a total systematic uncertainty of 1.4%. The spectrometer counts brehmsstrahlung photon
More than twenty institutes join the FCAL Collaboration in study of design of the very forward region of a detector for ILC and CLIC. Of particular importance is an accurate luminosity measurement to the level of 10-3, a requirement driven by the potential for precision physics at a future linear collider. In this paper, the method for luminosity measurement, requirements on luminometer and its integration in the forward region are presented. The impact of several effects contributing to the systematic uncertainty of luminosity measurement is given.
We present the first measurement of the negative pion total hadronic cross section on argon, which we performed at the Liquid Argon In A Testbeam (LArIAT) experiment. All hadronic reaction channels, as well as hadronic elastic interactions with scattering angle greater than 5~degrees are included. The pions have a kinetic energies in the range 100-700~MeV and are produced by a beam of charged particles impinging on a solid target at the Fermilab Test Beam Facility. LArIAT employs a 0.24~ton active mass Liquid Argon Time Projection Chamber (LArTPC) to measure the pion hadronic interactions. For this measurement, LArIAT has developed the ``thin slice method, a new technique to measure cross sections with LArTPCs. While generally higher than the prediction, our measurement of the ($pi^-$,Ar) total hadronic cross section is in agreement with the prediction of the Geant4 model when considering a model uncertainty of $sim$5.1%.
The MEG experiment, designed to search for the mu+->e+ gamma decay at a 10^-13 sensitivity level, completed data taking in 2013. In order to increase the sensitivity reach of the experiment by an order of magnitude to the level of 6 x 10-14 for the branching ratio, a total upgrade, involving substantial changes to the experiment, has been undertaken, known as MEG II. We present both the motivation for the upgrade and a detailed overview of the design of the experiment and of the expected detector performance.
The MEG experiment at the Paul Scherrer Institut searches for the charged-Lepton-Flavor-Violating mu+ -> e+ gamma decay. MEG has already set the world best upper limit on the branching ratio: BR<4.2x10^-13 @ 90% C.l. An upgrade (MEG II) of the whole detector has been approved to obtain a substantial increase of sensitivity. Currently MEG II is completing the upgrade of the various detectors, an engineering run and a pre-commissioning run were carried out during 2018 and 2019. The new positron tracker is a unique volume, ultra-light He based cylindrical drift chamber (CDCH), with high granularity: 9 layers of 192 square drift cells, ~6-9 mm wide, consist of ~12000 wires in a full stereo configuration. To ensure the electrostatic stability of the drift cells a new wiring strategy should be developed due to the high wire density (12 wires/cm^2 ), the stringent precision requirements on the wire position and uniformity of the wire mechanical tension (better than 0.5 g) The basic idea is to create multiwire frames, by soldering a set of (16 or 32) wires on 40 um thick custom wire-PCBs. Multiwire frames and PEEK spacers are overlapped alternately along the radius, to set the proper cell width, in each of the twelve sectors defined by the spokes of the rudder wheel shaped end-plates. Despite to the conceptual simplicity of the assembling strategies, the building of the multiwire frames, with the set requirements, imposes a use of an automatic wiring system. The MEG II CDCH is the first cylindrical drift chamber ever designed and built in a modular way and it will allow to track positrons, with a momentum greater than 45 MeV/c, with high efficiency by using a very small amount of material, 1.5x10^-3 X0 . We describe the CDCH design and construction, the wiring phase at INFN-Lecce, the choice of the wires, their mechanical properties, the assembly and sealing at INFN-Pisa and the commissioning.