Study the effect of temperature Salt drilling fluids on production Casing


Abstract in English

This research aims to decrease the cost of last production stages through decreasing the cost of potential casing repair by avoiding the problems that casing string may be exposed to. Such problems are caused by the temperature effect of salt drilling fluids as well as other fluids normally existed in the annular behind casing at the nonecemented intervals.

References used

CICEK ,V 2014-Corrosion Engineering.Willy,NewYork,754p
Farzan, M. Baghery , P. Mardan Dezfully ,H.R, 2011 Corrosion Study of steel API 5A,5L and AISI 1080,1020 in drilling- Mud environment of Iranian hydrocarbon field ISRN Materials Science
NOVIANTI ,E, B.T.H.Marbun ,B,2015 Inegrated Analysis of Optimizing Materials Selecyion Of Geothermal Well by Using a Model for Calculating Corrosion Rates , Proceeding world Geothermal Congress ,Melbourne ,Australia

Download