Evaluate the efficiency of the BIM in managing design changes: A Case Study


Abstract in English

This paper describes a case study in which we documented six examples of design changes. Then they are analyzed in two directions, the first is related to assessing the efficiency of the tools of BIM towards design changes and discovering their weaknesses, while the second is related to analyzing the characteristics of these changes within the information model of BIM and presenting them in the modeling of the change process.

References used

AKCAMETE, A.; AKINCI, B.; GARRETT, H.J. 2009 Motivation for Computational Support for Updating Building Information Models (Bims). International Workshop on Computing in Civil Engineering, ASCE, Austin, Texas
Al-SEDAIRY, S.T. 2001 A change management model for Saudi construction industry. International Journal of Project Management, Vol.19, No.3, 161–169
ALSHAWI, M.; FARAJ, I. 2002 Integrated construction environments: technology and implementation. Construction Innovation: Information, Process, Management, Vol. 2, No. 1, , 33-51

Download