This paper describes a case study in which we documented six examples of design changes. Then they are analyzed in two directions, the first is related to assessing the efficiency of the tools of BIM towards design changes and discovering their weaknesses, while the second is related to analyzing the characteristics of these changes within the information model of BIM and presenting them in the modeling of the change process.