Fuzzy Inference Model to Estimate the Impact of Changes orders on Construction Duration in Syria
published by Aِl-Baath University
in 2017
in
and research's language is
العربية
Download
Abstract in English
The aim of this study is to develop a fuzzy inference model to
estimate the impact of change orders on the duration of
construction projects in Syria. This can help in obtaining the
optimal estimation of the increasing of the project duration caused
by the changes. The capability of gradient estimation of the fuzzy
logic approach reduces the distrust of estimation using factor
assessment. Also it estimates the duration of the project after any
change.via the experts evaluation or according to the crisp logic.
References used
Abu Neamah M "Causes And Effects Of Change Order On Construction Projects" King Fahd University Of Petroleum And Minerals College Of Environmental Design, 2011
Chao hui Wu, Ting ya Hsieh, and Wen lon Cheng, "Statistical Analysis of Causes for Design Change in Highway Construction on Taiwan," International Journal of Project Management, vol. 23, p. 554–563, 2005
FHWA (1999). Asset Management Primer [en ligne]. U.S. Department of Transportation-Federal HighwayAdministration Office of Asset Management, Disponiblesur : http://www.fhwa.dot.gov/infrastructure/asstmgmt/amprimer.pdf