Contribution in the removal Lead and Copper from industrial water by using natural Phosphate of Syria


Abstract in English

The changes in coefficient of distribution of lead and cupper has been studied in system with two phases, liquid water contaminated with lead and copper-solid (natural Phosphate of Syria) correlation of the following factors: Time of mixing phases, size of the developed steel ,change the values of PH ,concentration of elemental lead and concentration of element capper ,the concentration of calcium as a competitor to the occupation of sites available on the solid phase, the ratio V\m presents the water phase size on the mass of phase ,the Percentage removal of lead from aqueous samples prepared in the laboratory91,57-99,95% were the best conditions for a vast proportion removed can be summarized as follows: PH=[6,63-10,11], Time of mixing phases =60 minutes and V/m=1000. The Percentage removal of copper from aqueous samples prepared in the laboratory 95,27 -99,96 % were the best conditions for a vast proportion removed can be summarized as follows: PH= [7,89-11,01] , Time of mixing phases =60 minutes and V/m=1000. Ideal conditions have been applied that were obtained according to laboratory tests on water samples from industrial input to Banias refinery and water samples from industrial drainage to Syrian company for oil transport after Removal for lead was( 100%,99 %). Removal for copper was( 100%,98 %) .

References used

Saxena,S;Souza, S.F. D. Heavy Metal Pollution Abatement Using Rock Phosphate Mineral. Heavy metal pollution using Founder’s Day Special Issue, 2005 ,94- 99
Sarioglu,M; Atay,U.A.Removal of copper from aqueous solution by phosphate rock .Desalination181,2005,303-311
Mouflih,M;Aklil,A. Removal of lead from aqueous solution by naturalphosphate Hydrometallurgy 81,2006, 219-225

Download