An approach to cost controlling of Concrete Bridges in Design Phase
published by Tishreen University
in 2013
in Management and Construction
and research's language is
العربية
Download
Abstract in English
This researchdeals with the topic of controlling the cost of concrete bridge projects in
the early design phase. The research aims at using cost controlling as an auxiliary tool for
designing and decision making.Cost control methodology has been proposed based on
modeling the elements of structure, and proposing a method forcost estimate. This method
based on estimating of quantitiesfrom the general parameters of the structure and prices are
being updated periodically.The proposed methodology studiesmany available alternatives
that werechosen by the designer andevaluate thesealternativeseconomically.
References used
Aparicio, A.C. ; Casas, J.R. ; Ramos, G.Computer Aided Design of PrestressedConcrete Highway Bridges,Computers and Structures, Vol.60,No.6, 1996, 957–969
Bernus, P.;Mertins,K.; Gunter, S.Handbook on Architectures of Information System,Business and Economics, U.S.A., 2006, 896
Cohn, M.Z. ;Lounis, Z. Optimal Design of Structural Concrete Bridge Systems. ASCE Journal of Structural Engineering, Vol. 120, No. 9, 1994, 2653–2674