Multiple agile Earth observation satellites, oversubscribed targets scheduling using complex networks theory


Abstract in English

The Earth observation satellites (EOSs) scheduling is of great importance to achieve efficient observation missions. The agile EOSs (AEOS) with stronger attitude maneuvering capacity can greatly improve observation efficiency while increasing scheduling complexity. The multiple AEOSs, oversubscribed targets scheduling problem with multiple observations are addressed, and the potential observation missions are modeled as nodes in the complex networks. To solve the problem, an improved feedback structured heuristic is designed by defining the node and target importance factors. On the basis of a real world Chinese AEOS constellation, simulation experiments are conducted to validate the heuristic efficiency in comparison with a constructive algorithm and a structured genetic algorithm.

Download