Stabilization of the arrival time of a relativistic electron beam to the 50 fs level


Abstract in English

We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The system latency was 350 ns and the correction bandwidth >23 MHz. The system meets the requirements for CLIC.

Download