Do you want to publish a course? Click here

The Cylindrical GEM Inner Tracker of the BESIII experiment: prototype test beam results

138   0   0.0 ( 0 )
 Added by Lia Lavezzi
 Publication date 2017
  fields Physics
and research's language is English




Ask ChatGPT about the research

A cylindrical GEM detector is under development, to serve as an upgraded inner tracker at the BESIII spectrometer. It will consist of three layers of cylindrically-shaped triple GEMs surrounding the interaction point. The experiment is taking data at the e+e- collider BEPCII in Beijing (China) and the GEM tracker will be installed in 2018. Tests on the performances of triple GEMs in strong magnetic field have been run by means of the muon beam available in the H4 line of SPS (CERN) with both planar chambers and the first cylindrical prototype. Efficiencies and resolutions have been evaluated using different gains, gas mixtures, with and without magnetic field. The obtained efficiency is 97-98% on single coordinate view, in many operational arrangements. The spatial resolution for planar GEMs has been evaluated with two different algorithms for the position determination: the charge centroid and the micro time projection chamber (mu-TPC) methods. The two modes are complementary and are able to cope with the asymmetry of the electron avalanche when running in magnetic field, and with non-orthogonal incident tracks. With the charge centroid, a resolution lower than 100 micron has been reached without magnetic field and lower than 200 micron with a magnetic field up to 1 T. The mu-TPC mode showed to be able to improve those results. In the first beam test with the cylindrical prototype, the detector had a very good stability under different voltage configurations and particle intensities. The resolution evaluation is in progress.



rate research

Read More

A cylindrical GEM tracker is under construction in order to replace and improve the inner tracking system of the BESIII experiment. Tests with planar chamber prototypes were carried out on the H4 beam line of SPS (CERN) with muons of 150 GeV/c momentum, to evaluate the efficiency and resolution under different working conditions. The obtained efficiency was in the 96 - 98% range. Two complementary algorithms for the position determination were developed: the charge centroid and the micro-TPC methods. With the former, resolutions <100 micron and <200 micron were achieved without and with magnetic field, respectively. The micro-TPC improved these results. By the end of 2016, the first cylindrical prototype was tested on the same beam line. It showed optimal stability under different settings. The comparison of its performance with respect to the planar chambers is ongoing. Here, the results of the planar prototype tests will be addressed.
The Cylindrical GEM-Inner Tracker (CGEM-IT) is the upgrade of the internal tracking system of the BESIII experiment. It consists of three layers of cylindrically-shaped triple GEMs, with important innovations with respect to the existing GEM detectors, in order to achieve the best performance with the lowest material budget. It will be the first cylindrical GEM running with analog readout inside a 1T magnetic field. The simultaneous measurement of both the deposited charge and the signal time will permit to use a combination of two algorithms to evaluate the spatial position of the charged tracks inside the CGEM-IT: the charge centroid and the micro time projection chamber modes. They are complementary and can cope with the asymmetry of the electron avalanche when running in magnetic field and with non-orthogonal incident tracks. To evaluate the behavior under different working settings, both planar chambers and the first cylindrical prototype have been tested during various test beams at CERN with 150 GeV/c muons and pions. This paper reports the results obtained with the two reconstruction methods and a comparison between the planar and cylindrical chambers.
Gas detector are very light instrument used in high energy physics to measure the particle properties: position and momentum. Through high electric field is possible to use the Gas Electron Multiplier (GEM) technology to detect the charged particles and to exploit their properties to construct a large area detector, such as the new IT for BESIII. The state of the art in the GEM production allows to create very large area GEM foils (up to 50x100 $mathrm{cm}^2$) and thanks to the small thickness of these foils is it possible to shape it to the desired form: a Cylindrical Gas Electron Multiplier (CGEM) is then proposed. The innovative construction technique based on Rohacell, a PMI foam, will give solidity to cathode and anode with a very low impact on material budget. The entire detector is sustained by Permaglass rings glued at the edges. These rings are used to assembly the CGEM, together with a dedicated Vertical Insertion System and moreover they host the On-Detector electronic. The anode has been improved w.r.t. the state of the art through a jagged readout that minimize the inter-strip capacitance. The mechanical challenge of this detector requires a precision of the entire geometry within few hundreds of microns in the whole area. In this contribution an overview of the construction technique, the validation of this technique through the realization of a CGEM, and its first tests will be presented. These activities are performed within the framework of the BESIIICGEM Project (645664), funded by the European Commission in the action H2020-RISE-MSCA-2014.
The Beijing Electron Spectrometer III (BESIII) is a multipurpose detector that collects data provided by the collision in the Beijing Electron Positron Collider II (BEPCII), hosted at the Institute of High Energy Physics of Beijing. Since the beginning of its operation, BESIII has collected the world largest sample of J/{psi} and {psi}(2s). Due to the increase of the luminosity up to its nominal value of 10^33 cm-2 s-1 and aging effect, the MDC decreases its efficiency in the first layers up to 35% with respect to the value in 2014. Since BESIII has to take data up to 2022 with the chance to continue up to 2027, the Italian collaboration proposed to replace the inner part of the MDC with three independent layers of Cylindrical triple-GEM (CGEM). The CGEM-IT project will deploy several new features and innovation with respect the other current GEM based detector: the {mu}TPC and analog readout, with time and charge measurements will allow to reach the 130 {mu}m spatial resolution in 1 T magnetic field requested by the BESIII collaboration. In this proceeding, an update of the status of the project will be presented, with a particular focus on the results with planar and cylindrical prototypes with test beams data. These results are beyond the state of the art for GEM technology in magnetic field.
Gas detector are very light instrument used in high energy physics to measure the particle properties: position and momentum. Through high electric field is possible to use the Gas Electron Multiplier (GEM) technology to detect the particles and to exploit the its properties to construct a large area detector, such as the new IT for BESIII. The state of the art in the GEM production allow to create very large area GEM foils (up to 50x100 cm2) and thanks to the small thickness of these foil is it possible to shape it to the desired form: a Cylindrical Gas Electron Multiplier (CGEM) is then proposed. The innovative construction technique based on Rohacell, a PMI foam, will give solidity to cathode and anode with a very low impact on material budget. The entire detector is sustained by permaglass rings glued at the edges. These rings are use to assembly the CGEM together with a dedicated Vertical Insertion System and moreover there is placed the On-Detector electronic. The anode has been improved w.r.t. the state of the art through a jagged readout that minimize the inter-strip capacitance. The mechanical challenge of this detector requires a precision of the entire geometry within few hundreds of microns in the whole area. In this presentation will be presented an overview of the construction technique and the validation of this technique through the realization of a CGEM and its first tests. These activities are performed within the framework of the BESIIICGEM Project (645664), funded by the European Commission in the action H2020-RISE-MSCA-2014.
comments
Fetching comments Fetching comments
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا