ﻻ يوجد ملخص باللغة العربية
Two optical data link data transmission Application Specific Integrated Circuits (ASICs), the baseline and its backup, have been designed for the ATLAS Liquid Argon (LAr) Calorimeter Phase-I trigger upgrade. The latency of each ASIC and that of its corresponding receiver implemented in a back-end Field-Programmable Gate Array (FPGA) are critical specifications. In this paper, we present the latency measurements and simulation of two ASICs. The measurement results indicate that both ASICs achieve their design goals and meet the latency specifications. The consistency between the simulation and measurements validates the ASIC latency characterization.
A Liquid-argon Trigger Digitizer Board (LTDB) is being developed to upgrade the ATLAS Liquid Argon Calorimeter Phase-I trigger electronics. The LTDB located at the front end needs to obtain the clock signals and be configured and monitored remotely f
We present the procedures and results of the quality control tests for the front-end optical link components in the ATLAS Liquid Argon Calorimeter Phase-1 upgrade. The components include a Vertical-Cavity Surface-Emitting Laser (VCSEL) driver ASIC LO
In this paper, we present the design and test results of LOCx2, a transmitter ASIC for the ATLAS Liquid Argon Calorimeter trigger upgrade. LOCx2 consists of two channels and each channel encodes ADC data with an overhead of 14.3% and transmits serial
A serializer ASIC and a VCSEL driver ASIC are needed for the front-end optical data transmission in the ATLAS liquid argon calorimeter readout phase-I upgrade. The baseline ASICs are the serializer LOCx2 and the VCSEL driver LOCld, designed in a 0.25
The construction of the ATLAS electromagnetic liquid argon calorimeter modules is completed and all the modules are assembled and inserted in the cryostats. During the production period four barrel and three endcap modules were exposed to test beams