The DZERO experiment located at Fermilab has recently started RunII with an upgraded detector. The RunII physics program requires the Data Acquisition to readout the detector at a rate of 1 KHz. Events fragments, totaling 250 KB, are readout from approximately 60 front end crates and sent to a particular farm node for Level 3 Trigger processing. A scalable system, capable of complex event routing, has been designed and implemented based on commodity components: VMIC 7750 Single Board Computers for readout, a Cisco 6509 switch for data flow, and close to 100 Linux-based PCs for high-level event filtering.