ترغب بنشر مسار تعليمي؟ اضغط هنا

Status of KEKB accelerator and detector, BELLE

49   0   0.0 ( 0 )
 نشر من قبل Fumihiko Takasaki
 تاريخ النشر 1999
  مجال البحث
والبحث باللغة English
 تأليف Fumihiko Takasaki




اسأل ChatGPT حول البحث

Status of the KEKB accelerator and the detector, BELLE, is reported. The construction of the 3.5 Gev x 8 GeV electron-positron collider, and the solenoid detector, BELLE, was completed in December, 1998. The commissioning of them has been made since then. The BELLE detector has observed the first hadronic event from the beam collision on Jun 1, 1999. The achieved maximum luminosity by August 4th, 1999, was 3 x 10^32 cm^-2 sec^-1. The KEKB operation will be continued after two months of summer break.



قيم البحث

اقرأ أيضاً

100 - J. Fast 2011
High precision flavor physics measurements are an essential complement to the direct searches for new physics at the LHC. Such measurements will be performed using the upgraded Belle II detector and upgraded KEKB accelerator. The status of the Belle II detector and proposed role of the US Belle II collaborators are presented in this article.
204 - T. Aushev 2012
High precision measurements in the quark flavor sector are essential for searching for new physics beyond the Standard model. SuperKEKB collider and Belle II detector are designed to perform such measurements. The status and prospects of the SuperKEKB and Belle II are presented in this article.
The introduction of magnetic charge into Maxwells equations has led to an extensive search for magnetically charged particles (magnetic monopoles). A particle model developed by one of us (DF) adds an additional feature to Maxwells symmetric equation s in that the stable magnetic monopole should have the same charge strength as the electron. We have not found any experiments in high-energy physics that have explicitly ruled out this possibility. However, the few experiments at colliders that had no magnetic field might have observed a signal for these 1e strength magnetic monopoles as an unexpected enhancement in the mu+mu- production rate. The absence of any such observation leads us to set a tentative lower mass limit for these unit charge magnetic monopoles at 4.5-5 GeV/c2. Using a MC generator for magnetic charge and tracking these events through a simplified model of the BELLE II detector, we have found that the central drift chamber of BELLE II has a remarkably high efficiency for triggering on magnetically charged tracks. We suggest that the BELLE II collaboration perform a specific search for stable magnetically charged particles having a field strength of 1e when they run for the first time with colliding beams in 2018. This would be the first time anyone has specifically looked for such a particle.
178 - H.Kichimi , K.Trabelsi , S.Uehara 2010
Using the Belle detector we study the characteristics of beam collisions at the KEKB 3.5 GeV $e^+$ on 8 GeV $e^-$ asymmetric energy collider. We investigate the collision timing {tip} and its $z$-coordinate along the beam axis {zip} as a function of the position of the colliding bunch in a beam train. The various {tip} and {zip} behaviors observed by Belle are attributed to beam loading effects in the radio frequency cavities that accelerate the beams with a beam abort gap. We report these results in detail and discuss the prospects for the SuperKEKB collider.
The brief history, physics program and the current status of the SVD-2 detector is presented. The future plans for the experiments with upgraded SVD-2M setup is discussed.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا