ترغب بنشر مسار تعليمي؟ اضغط هنا

An overview of the NIRSPEC upgrade for the Keck II telescope

78   0   0.0 ( 0 )
 نشر من قبل Emily Martin
 تاريخ النشر 2018
  مجال البحث فيزياء
والبحث باللغة English




اسأل ChatGPT حول البحث

NIRSPEC is a 1-5 micron echelle spectrograph in use on the Keck II Telescope since 1999. The spectrograph is capable of both moderate (R~2,000) and high (R~25,000) resolution observations and has been a workhorse instrument across many astronomical fields, from planetary science to extragalactic observations. In the latter half of 2018, we will upgrade NIRSPEC to improve the sensitivity and stability of the instrument and increase its lifetime. The major components of the upgrade include replacing the spectrometer and slit-viewing camera detectors with Teledyne H2RG arrays and replacing all transputer-based electronics. We present detailed design, testing, and analysis of the upgraded instrument, including the finalized optomechanical design of the new 1-5 micron slit-viewing camera, final alignment and assembly of the science array, electronics systems, and updated software design.



قيم البحث

اقرأ أيضاً

BICEP3 is a 520 mm aperture, compact two-lens refractor designed to observe the polarization of the cosmic microwave background (CMB) at 95 GHz. Its focal plane consists of modularized tiles of antenna-coupled transition edge sensors (TESs), similar to those used in BICEP2 and the Keck Array. The increased per-receiver optical throughput compared to BICEP2/Keck Array, due to both its faster f/1.7 optics and the larger aperture, more than doubles the combined mapping speed of the BICEP/Keck program. The BICEP3 receiver was recently upgraded to a full complement of 20 tiles of detectors (2560 TESs) and is now beginning its second year of observation (and first science season) at the South Pole. We report on its current performance and observing plans. Given its high per-receiver throughput while maintaining the advantages of a compact design, BICEP3-class receivers are ideally suited as building blocks for a 3rd-generation CMB experiment, consisting of multiple receivers spanning 35 GHz to 270 GHz with total detector count in the tens of thousands. We present plans for such an array, the new BICEP Array that will replace the Keck Array at the South Pole, including design optimization, frequency coverage, and deployment/observing strategies.
109 - A. Nepomuk Otte 2009
The VERITAS Cherenkov telescope array has been fully operational since Fall 2007 and has fulfilled or outperformed its design specifications. We are preparing an upgrade program with the goal to lower the energy threshold and improve the sensitivity of VERITAS at all accessible energies. In the baseline program of the upgrade we will relocate one of the four telescopes, replace the photo-sensors by higher efficiency photomultipliers and install a new trigger system. In the enhanced program of the upgrade we foresee, in addition, the construction of a fifth telescope and installation of an active mirror alignment system.
The Square Kilometre Array (SKA) project is an international effort to build the world s largest radio telescope, enabling science with unprecedented detail and survey speed. The project spans over a decade and is now at a mature stage, ready to ente r the construction and integration phase. In the fully deployed state, the MID-Telescope consists of a 150-km diameter array of offset Gregorian antennas installed in the radio quiet zone of the Karoo desert (South Africa). Each antenna is equipped with three feed packages, that are precision positioned in the sub-reflector focus by a feed indexer platform. The total observational bandwidth (0.35-15.4GHz) is segmented into seven bands. Band 1 (0.35-1.05GHz) and Band 2 (0.95-1.76GHz) are implemented as individual feed packages. The remaining five bands (Bands 3, 4, 5a, 5b, and 6) are combined in a single feed package. Initially only Band 5a (4.6-8.5GHz) and Band 5b (8.3-15.4GHz) will be installed. This paper provides an overview of recent progress on design, test and integration of each feed package as well as project and science goals, timeline and path to construction.
Motivated by the ever increasing pursuit of science with the transient sky (dubbed Time Domain Astronomy or TDA), we are fabricating and will commission a new deployable tertiary mirror for the Keck I telescope (K1DM3) at the W.M. Keck Observatory. T his paper presents the detailed design of K1DM3 with emphasis on the opto-mechanics. This project has presented several design challenges. Foremost are the competing requirements to avoid vignetting the light path when retracted against a sufficiently rigid system for high-precision and repeatable pointing. The design utilizes an actuated swing arm to retract the mirror or deploy it into a kinematic coupling. The K1DM3 project has also required the design and development of custom connections to provide power, communications, and compressed air to the system. This NSF-MRI funded project is planned to be commissioned in Spring 2017.
The Large Optical/infrared Telescope (LOT) is a ground-based 12m diameter optical/infrared telescope which is proposed to be built in the western part of China in the next decade. Based on satellite remote sensing data, along with geographical, logis tical and political considerations, three candidate sites were chosen for ground-based astronomical performance monitoring. These sites include: Ali in Tibet, Daocheng in Sichuan, and Muztagh Ata in Xinjiang. Up until now, all three sites have continuously collected data for two years. In this paper, we will introduce this site testing campaign, and present its monitoring results obtained during the period between March 2017 and March 2019.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا