ترغب بنشر مسار تعليمي؟ اضغط هنا

Pulsed UCN production using a Doppler shifter at J-PARC

146   0   0.0 ( 0 )
 نشر من قبل Sohei Imajo
 تاريخ النشر 2015
  مجال البحث فيزياء
والبحث باللغة English




اسأل ChatGPT حول البحث

We have constructed a Doppler-shifter-type pulsed ultra-cold neutron (UCN) source at the Materials and Life Science Experiment Facility (MLF) of the Japan Proton Accelerator Research Complex (J-PARC). Very-cold neutrons (VCNs) with 136-$mathrm{m/s}$ velocity in a neutron beam supplied by a pulsed neutron source are decelerated by reflection on a m=10 wide-band multilayer mirror, yielding pulsed UCN. The mirror is fixed to the tip of a 2,000-rpm rotating arm moving with 68-$mathrm{m/s}$ velocity in the same direction as the VCN. The repetition frequency of the pulsed UCN is $8.33~mathrm{Hz}$ and the time width of the pulse at production is $4.4~mathrm{ms}$. In order to increase the UCN flux, a supermirror guide, wide-band monochromatic mirrors, focus guides, and a UCN extraction guide have been newly installed or improved. The $1~mathrm{MW}$-equivalent count rate of the output neutrons with longitudinal wavelengths longer than $58~mathrm{nm}$ is $1.6 times 10^{2}~mathrm{cps}$, while that of the true UCNs is $80~mathrm{cps}$. The spatial density at production is $1.4~mathrm{UCN/cm^{3}}$. This new UCN source enables us to research and develop apparatuses necessary for the investigation of the neutron electric dipole moment (nEDM).



قيم البحث

اقرأ أيضاً

Discussions in the taskforce meetings in the period of Jan.-Mar. 2009 on the technical possibility of the ultracold neutron (UCN) source at the Japan Proton Accelerator Research Complex (J-PARC) is summarized.
Neutron Optics and Physics (NOP/ BL05) at MLF in J-PARC is a beamline for studies of fundamental physics. The beamline is divided into three branches so that different experiments can be performed in parallel. These beam branches are being used to de velop a variety of new projects. We are developing an experimental project to measure the neutron lifetime with total uncertainty of 1 s (0.1%). The neutron lifetime is an important parameter in elementary particle and astrophysics. Thus far, the neutron lifetime has been measured by several groups; however, different values are obtained from different measurement methods. This experiment is using a method with different sources of systematic uncertainty than measurements conducted to date. We are also developing a source of pulsed ultra-cold neutrons (UCNs) produced from a Doppler shifter are available at the unpolarized beam branch. We are developing a time focusing device for UCNs, a so called rebuncher, which can increase UCN density from a pulsed UCN source. At the low divergence beam branch, an experiment to search an unknown intermediate force with nanometer range is performed by measuring the angular dependence of neutron scattering by noble gases. Finally the beamline is also used for the research and development of optical elements and detectors. For example, a position sensitive neutron detector that uses emulsion to achieve sub-micrometer resolution is currently under development. We have succeeded in detecting cold and ultra-cold neutrons using the emulsion detector.
200 - M.Harada , S.Hasegawa , Y.Kasugai 2015
On April 2015, the J-PARC E56 (JSNS2: J-PARC Sterile Neutrino Search using neutrinos from J-PARC Spallation Neutron Source) experiment officially obtained stage-1 approval from J-PARC. We have since started to perform liquid scintillator R&D for impr oving energy resolution and fast neutron rejection. Also, we are studying Avalanche Photo-Diodes (SiPM) inside the liquid scintillator. In addition to the R&D work, a background measurement for the proton beam bunch timing using a small liquid scintillator volume was planned, and the safety discussions for the measurement have been done. This report describes the status of the R&D work and the background measurements, in addition to the milestones required before stage-2 approval.
178 - M.Harada , S.Hasegawa , Y.Kasugai 2016
The JSNS2 (J-PARC E56) experiment aims to search for sterile neutrinos at the J-PARC Materials and Life Sciences Experimental Facility (MLF).After the submission of a proposal to the J-PARC PAC, stage-1 approval was granted to the JSNS2 experiment. T he approval followed a series of background measurements which were performed in 2014. Subsequent for stage-1 approval, the JSNS2 collaboration has made continuous efforts to write a Technical Design Report (TDR).This TDR will include two major items as discussed in the previous status report for the 20th J-PARC PAC: (1) A realistic detector location (2) Well understood and realistic detector performance using simulation studies, primarily in consideration of fast neutron rejection. Since August we have been in discussions with MLF staff regarding an appropriate detector location. We are also in the process of setting up a Monte Carlo (MC) simulation framework in order to study detectors performance in realistic conditions. In addition, we have pursued hardware R&D work for the liquid scintillator (LS) and to improve the dynamic range of the 10 photomultiplier tubes (PMTs). The LS R&D works includes Cherenkov studies inside the LS, and a Pulse Shape Discrimination (PSD) study with a test-beam, performed at Tohoku University. We also estimate the PSD performance of a full-sized detector using a detailed MC simulation. In this status report, we describe progress on this work.
173 - M.Harada , S.Hasegawa , Y.Kasugai 2016
The JSNS$^2$ (J-PARC E56) experiment aims to search for a sterile neutrino at the J-PARC Materials and Life Sciences Experimental Facility (MLF). After the submission of a proposal to the J-PARC PAC, Stage-1 approval was granted to the JSNS$^2$ exper iment on April 2015.This approval followed a series of background measurements which were performed in 2014. Recently, funding (the grant-in-aid for scientific research (S)) in Japan for building one 25~ton fiducial volume detector module was approved for the experiment. Therefore, we aim to start the experiment with one detector in JFY2018-2019. We are now working to produce precise cost estimates and schedule for construction, noting that most of the detector components can be produced within one year from the date of order. This will be reported at the next PAC meeting. In parallel to the detector construction schedule, JSNS$^2$ will submit a Technical Design report (TDR) to obtain the Stage-2 approval from the J-PARC PAC.The recent progress of the R$&$D efforts towards this TDR are shown in this report. In particular, the R$&$D status of the liquid scintillator, cosmic ray veto system, and software are shown. We have performed a test-experiment using 1.6~L of liquid scintillator at the 3rd floor of the MLF building in order to determine the identities of non-neutrino background particles coming to this detector location during the proton bunch. This is the so-called MLF 2015AU0001 experiment. We briefly show preliminary results from this test-experiment.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا