ترغب بنشر مسار تعليمي؟ اضغط هنا

Building LOFAR - status update

136   0   0.0 ( 0 )
 نشر من قبل Mike Garrett
 تاريخ النشر 2009
  مجال البحث فيزياء
والبحث باللغة English




اسأل ChatGPT حول البحث

The Low Frequency Array (LOFAR) is a new generation of electronic radio telescope based on aperture array technology and working in the frequency range of 30-240 MHz. The telescope is being developed by ASTRON, and currently being rolled-out across the Netherlands and other countries in Europe. The plan is to build at least 36 stations in the Netherlands (with baseline lengths of up to 100 km), 5 stations in Germany, and 1 station in each of Sweden, France and the UK. With baseline lengths of up to 2000 km, sub-arcsecond resolution will be possible at the highest frequencies. The Key Science Projects being addressed by the project include: deep, wide-field cosmological surveys, transients, the epoch of re-ionisation and cosmic ray studies. We present the current status of the project, including the development of the super-core in Exloo and the completion of the first 3 stations. First fringes from these stations is also presented.



قيم البحث

اقرأ أيضاً

A test of a cornerstone of general relativity, the gravitational redshift effect, is currently being conducted with the RadioAstron spacecraft, which is on a highly eccentric orbit around Earth. Using ground radio telescopes to record the spacecraft signal, synchronized to its ultra-stable on-board H-maser, we can probe the varying flow of time on board with unprecedented accuracy. The observations performed so far, currently being analyzed, have already allowed us to measure the effect with a relative accuracy of $4times10^{-4}$. We expect to reach $2.5times10^{-5}$ with additional observations in 2016, an improvement of almost a magnitude over the 40-year old result of the GP-A mission.
We present the latest update of the European Southern Observatorys Very Large Telescope interferometer (VLTI). The operations of VLTI have greatly improved in the past years: reduction of the execution time; better offering of telescopes configuratio ns; improvements on AMBER limiting magnitudes; study of polarization effects and control for single mode fibres; fringe tracking real time data, etc. We present some of these improvements and also quantify the operational improvements using a performance metric. We take the opportunity of the first decade of operations to reflect on the VLTI community which is analyzed quantitatively and qualitatively. Finally, we present briefly the preparatory work for the arrival of the second generation instruments GRAVITY and MATISSE.
The coronagraphic instrument (CGI) on the Wide-Field Infrared Survey Telescope (WFIRST) will demonstrate technologies and methods for high-contrast direct imaging and spectroscopy of exoplanet systems in reflected light, including polarimetry of circ umstellar disks. The WFIRST management and CGI engineering and science investigation teams have developed requirements for the instrument, motivated by the objectives and technology development needs of potential future flagship exoplanet characterization missions such as the NASA Habitable Exoplanet Imaging Mission (HabEx) and the Large UV/Optical/IR Surveyor (LUVOIR). The requirements have been refined to support recommendations from the WFIRST Independent External Technical/Management/Cost Review (WIETR) that the WFIRST CGI be classified as a technology demonstration instrument instead of a science instrument. This paper provides a description of how the CGI requirements flow from the top of the overall WFIRST mission structure through the Level 2 requirements, where the focus here is on capturing the detailed context and rationales for the CGI Level 2 requirements. The WFIRST requirements flow starts with the top Program Level Requirements Appendix (PLRA), which contains both high-level mission objectives as well as the CGI-specific baseline technical and data requirements (BTR and BDR, respectively)... We also present the process and collaborative tools used in the L2 requirements development and management, including the collection and organization of science inputs, an open-source approach to managing the requirements database, and automating documentation. The tools created for the CGI L2 requirements have the potential to improve the design and planning of other projects, streamlining requirement management and maintenance. [Abstract Abbreviated]
77 - B. Emonts 2019
CASA, the Common Astronomy Software Applications package, is the primary data processing software for the Atacama Large Millimeter/submillimeter Array (ALMA) and NSFs Karl G. Jansky Very Large Array (VLA), and is frequently used also for other radio telescopes. The CASA software can process data from both single-dish and aperture-synthesis telescopes, and one of its core functionalities is to support the data reduction and imaging pipelines for ALMA, VLA and the VLA Sky Survey (VLASS). CASA has recently undergone several exciting new developments, including an increased flexibility in Python (CASA 6), support of Very Long Baseline Interferometry (VLBI), performance gains through parallel imaging, data visualization with the new Cube Analysis Rendering Tool for Astronomy (CARTA), enhanced reliability and testing, and modernized documentation. These proceedings of the 2019 Astronomical Data Analysis Software & Systems (ADASS) conference give an update of the CASA project, and detail how these new developments will enhance user experience of CASA.
We present laboratory results of the closed-loop performance of the Magellan Adaptive Optics (AO) Adaptive Secondary Mirror (ASM), pyramid wavefront sensor (PWFS), and VisAO visible adaptive optics camera. The Magellan AO system is a 585-actuator low -emissivity high-throughput system scheduled for first light on the 6.5 meter Magellan Clay telescope in November 2012. Using a dichroic beamsplitter near the telescope focal plane, the AO system will be able to simultaneously perform visible (500-1000 nm) AO science with our VisAO camera and either 10 micron or 3-5 micron science using either the BLINC/MIRAC4 or CLIO cameras, respectively. The ASM, PWS, and VisAO camera have undergone final system tests in the solar test tower at the Arcetri Institute in Florence, Italy, reaching Strehls of 37% in i-band with 400 modes and simulated turbulence of 14 cm ro at v-band. We present images and test results of the assembled VisAO system, which includes our prototype advanced Atmospheric Dispersion Corrector (ADC), prototype calcite Wollaston prisms for SDI imaging, and a suite of beamsplitters, filters, and other optics. Our advanced ADC performs in the lab as designed and is a 58% improvement over conventional ADC designs. We also present images and results of our unique Calibration Return Optic (CRO) test system and the ASM, which has successfully run in closed- loop at 1kHz. The CRO test is a retro reflecting optical test that allows us to test the ASM off-sky in close-loop using an artificial star formed by a fiber source.
التعليقات
جاري جلب التعليقات جاري جلب التعليقات
سجل دخول لتتمكن من متابعة معايير البحث التي قمت باختيارها
mircosoft-partner

هل ترغب بارسال اشعارات عن اخر التحديثات في شمرا-اكاديميا